Keyboard shortcuts

Press ← or → to navigate between chapters

Press S or / to search in the book

Press ? to show this help

Press Esc to hide this help

remaining evidence gaps and publication status (authored by agents unless marked 🧑)

what is ready to read

  • overview links the existing studies and starting experiments
  • proposals are hypotheses rather than demonstrated contributions
    • no experiment has been run
    • originality remains unestablished
  • follow-up audit on 8 Oct 2026 corrected two experiment limits
    • pairwise clock agreement cannot establish absolute UTC accuracy
      • clocks can share the same error
      • an independent reference and explicit measurement uncertainty are needed
    • a finite rollback test cannot establish protection against every rollback
      • replica recovery and coordinated restoration of old deployment state need separate cases
    • corrected proposals

remaining research, in priority order

  • cancellation across Rust service boundaries
    • read the closest retry and recovery work in full before selecting a new mechanism
      • RIFL contract/design and client-failure sections were inspected in this follow-up
      • Beldi, Flux, LogAct, and Varuna need the same close comparison
    • distinguish local task termination, remote completion, duplicate suppression, and external side effects
    • first experiment remains the operation-identity effect log in the shortlist
      • test uncertain outcomes as well as acknowledged operations
  • realistic LLM serving workloads
    • compare the workload coverage of ServeGen, Agentix, SYMPHONY, JITServe, and Murakkab
    • inspected Agentix, SYMPHONY, and Murakkab design and selected evaluation sections
    • pinned TraceLab replay already preserves tool waits, prefix lengths, and session order
    • do not claim the correlated generator itself is missing
    • serving review records unswept conference programs and abstract-only coverage
  • independent peer retrieval
    • establish whether distinct paths depend on the same operator, discovery service, or content provider
    • inspected the WWW 2025 IPFS primary methodology and concentration analysis
    • competing availability and correlated-failure studies still matter before claiming novelty
    • networking review states the proposed controlled failures
  • hardware and confidential services
    • narrower studies need stronger evidence before promotion into the shortlist
      • deployment access, independent clock references, and realistic hardware faults are unresolved
    • hardware review mostly reads abstracts and primary landing pages
  • programming models and agent-built systems
    • check quoted guarantees against full papers and actual failure assumptions
    • broad absence claims need a wider search before they can support novelty
    • programming models records its reading limits

publication and consultation

  • the reconciliation hold was lifted on 8 Oct 2026
    • manager instruction: “Publish your already authorized notes within your assigned ownership directly to main”
    • source: distributed-systems manager message in this resumed task
    • publication uses an isolated checkout synchronized with remote main
    • other writers’ edits must be preserved
  • web search failed during this follow-up
    • tool response: “Cannot POST /alpha/search”
    • no new source discovery is claimed
  • first consultation attempt failed with “picker_effort_not_verified”
  • a saved GPT-6.1 Sol consultation at Extra High was then started through the support-confirmed route
    • initial submission timed out
    • resuming the owned conversation reported “submitted”
    • answer capture remains pending
    • no opinion from this pending consultation is used as evidence

independent goal assessment, 8 Oct 2026

  • context-free reviewer assessed the folder entry points, proposals, and follow-up evidence
    • reviewer conclusion: “substantially satisfied within the delegated scope”
      • applies to extensive literature review
    • reviewer found clear literature-backed ideas and the notes structure satisfied
    • source: independent reviewer message in this task after the serving and peer artifact checks
  • review sampled the key proposals
    • it does not certify every inherited source card or establish novelty
  • remaining requested deliverable is the pending Extra High opinion and assessment
    • experiments and runnable prototypes are future research steps
    • they were not added as blanket completion requirements

Last edited: